Logo Sadam

Loading 3D scene...

โ—ˆ Get to know me

About Me

Sadam Al Rasyid

Sadam Al Rasyid

Bandung, West Java, Indonesia

I am a Telecommunication Engineering master's student at Telkom University, Lead Developer at Telkom Indonesia, Full-Stack Web Developer, AI Engineer, and Certified Risk Associate. My professional positioning combines Information Technology, Artificial Intelligence, Risk Management, and Compliance Technology, with a focus on AI-powered audit automation, Semantic RAG pipelines, ISO 31000 risk management, ISO/IEC 27001 information security compliance, ISO-based governance, risk assessment, compliance audit workflows, GRC systems, telecommunications infrastructure, and digital transformation.

๐Ÿš€
0+
Projects
๐Ÿ†
0+
Awards
๐Ÿ“„
0
Publications

โšก Tech Stack

Full-Stack Web DevelopmentArtificial IntelligenceNLP PipelineSemantic RAGRisk ManagementGovernance, Risk & Compliance (GRC)AI EngineeringWeb DevelopmentTelecommunicationsIoTDigital TransformationRisk ManagementAudit and Compliance TechnologyGovernance, Risk & Compliance (GRC)

๐ŸŽ“ Education Journey

๐ŸŽ“Feb 2025 โ€“ Present

Master's Student

Telecommunication Engineering

Telkom University ยท Bandung, West Java

GPA: 3.85 / 4.0041 CreditsMaster by Research Scholarship
๐ŸŽ“Aug 2021 โ€“ Jan 2025

Undergraduate Student

Telecommunication Engineering

Telkom University ยท Bandung, West Java

GPA: 3.58 / 4.00148 CreditsCum Laude

๐Ÿ“„ StandBy: Implementation of Artificial Intelligence of Things for Infant Incubator Standardization Management System.

โšก Skills & Technologies

Soft Skills

Analytical Thinking
Communication
Initiative & Problem-Solving
Leadership
Teamwork & Collaboration
Adaptability
Time Management

Technical Skills

Full-Stack Web Development
Artificial Intelligence
NLP Pipeline
Semantic RAG
Risk Management
Governance, Risk & Compliance (GRC)
ISO 31000
ISO/IEC 27001
Risk Register Development
Risk Assessment
Compliance Matrix
Compliance Audit
AI Governance
Audit Readiness
Information Security Compliance
AI-Powered Audit Automation
AI-Powered Compliance Technology
ISO Compliance Systems
ISO/IEC 17025 Compliance Systems
ISO-Based Governance
REST API Development
Web Dashboard Development
Database System Design
IoT
Telecommunications Infrastructure
Fiber Optic Testing
UI/UX Design
Research and Technical Writing
LaTeX
Git

Languages

Indonesian: Native
English: B1 Level Proficiency

Interests

AI Engineering
Web Development
Telecommunications
IoT
Digital Transformation
Risk Management
Audit and Compliance Technology
Governance, Risk & Compliance (GRC)

Certifications & Training

BNSP Certified Risk Associate (CRA)
Training CRA / Risk Management Training
Pre Security Learning Path
Alibaba Cloud Certified Associate
ACA Big Data Certification
General English B1 - Telkom University Language Center
Design Thinking for Beginners - SkillUp
Premium Program EnglishLab Advanced Level

โ—ˆ Where I've worked

Professional Experience

  • โ—Architected and developed backend infrastructure and database systems for an AI-driven audit automation platform supporting risk-informed compliance evaluation for ISO/IEC 17025, ISO/IEC 17065, and ISO 9001.
  • โ—Built and optimized AI models for automated document-to-clause mapping, improving classification accuracy and reducing manual audit workload.
  • โ—Designed intelligent document processing pipelines using NLP and semantic analysis, with a flexible dataset architecture adaptable to multiple ISO-based governance, risk, and compliance frameworks.

โ—ˆ Beyond core roles

Community Leadership

Volunteer Experience

Jan 2024Volunteer

Organizer โ€” AI-Based Auto Assessment for SMP Telkom Bandung

Telkom University

Bandung, West Java

  • Supported a community service program improving student evaluation through AI-based text auto-assessment.
  • Collaborated with lecturers and volunteers to conduct workshops and application testing at SMP Telkom Bandung.
Sep 2023Volunteer

Keynote Speaker โ€” IT Industry, Campus Culture, Scholarships, and Digital Revolution

SMK 2 Pasundan

Bandung, West Java

  • Delivered a keynote session on IT career development, campus life, scholarships, and digital transformation.
  • Engaged students through interactive discussions on adapting to technological change.
Aug 2023 โ€“ Sep 2023Volunteer

Participant โ€” KKNT LLDIKTI 4 Independent College Program

Telkom University

Bandung, West Java

  • Participated in a village empowerment program focused on capacity building, digital literacy, and local development.
Mar 2023Volunteer

Keynote Speaker โ€” ABDIMAS BNN CapCut Content Creator Training

Telkom University

Bandung, West Java

  • Supported content creation training for 25+ public relations representatives from 14 BNN divisions in West Java.
Feb 2023Volunteer

Keynote Speaker โ€” Kahoot Training for Kindergarten Teachers

Telkom University

Bandung, West Java

  • Conducted training on Kahoot-based gamification to improve teacher engagement and digital learning delivery.
Jan 2023Volunteer

Organizer โ€” Micro-Hydro Training

Telkom University

Bandung, West Java

  • Coordinated training on micro-hydro power planning, operation, and management for renewable energy capacity building.
Jun 2022Volunteer

Organizer โ€” Scratch Programming Training

Telkom University

Bandung, West Java

  • Delivered beginner-friendly Scratch programming sessions for kindergarten teachers to strengthen digital teaching methods.

Organizational Experience

Feb 2023 โ€“ Feb 2025

Project Manager โ€” Music Division

Bengkel Seni EMBUN

Bandung, West Java

  • Led the Music Division in organizing 2 program batches with a total of 84 participants.
  • Mentored and taught 20+ participants through guided music sessions.
  • Served as Chief Executive of the 2023 CSR program Kami Mahasiswa Interes, directing a 57-member organizing committee.
Feb 2023 โ€“ Mar 2023

Organizer Committee โ€” Logistics Division

GATHRAK 2023

Bandung, West Java

  • Managed logistics operations for a large-scale event supported by a 100-member organizing committee.
  • Oversaw procurement, distribution, catering coordination, and event equipment readiness.
Aug 2022 โ€“ Feb 2023

Organizer Committee โ€” Monetary and Funding Division

TESLA 2022

Bandung, West Java

  • Developed funding strategies, managed event financial planning, and coordinated revenue generation through entrepreneurship initiatives.
  • Coordinated financial tracking and budgeting processes for an event involving 100+ participants.

โ—ˆ What I've built

Featured Projects

AI-Based Audit Tracking System / ALYSA

AI EngineerDec 2025 โ€“ Jun 2026Telkom Test HouseBandung, West Java

Architected and deployed an AI-powered ISO/IEC 17025 audit engine using a Semantic RAG pipeline for intelligent document analysis and risk-informed compliance review. Engineered a deterministic Semantic Shield and assessor knowledge base to minimize LLM hallucinations and false positives. Automated document classification, evidence extraction, compliance gap analysis, and audit risk assessment, reducing audit tracking time by 40โ€“50% while maintaining high assessment accuracy.

PythonNLP PipelineSemantic RAGGRC WorkflowREST APIWeb DashboardGit

AI-Based Risk Register & Risk Assessment for ALYSA

Risk Management Analyst & AI Engineer2026ALYSA AI Audit EcosystemBandung, West Java

Designed and developed a structured Risk Register for the ALYSA AI-powered audit automation platform to support governance, risk identification, and compliance control. Conducted risk identification, likelihood-impact analysis, inherent risk assessment, residual risk assessment, and mitigation planning based on ISO 31000 risk management principles. Developed risk categorization, risk scoring, and monitoring mechanisms to support AI governance, operational control, and compliance assurance. Integrated risk management practices with audit automation workflows to improve accountability, traceability, and decision-making. Strengthened the Governance, Risk & Compliance foundation of ALYSA by connecting technical AI implementation with structured risk management methodology.

Risk ManagementISO 31000Governance, Risk & ComplianceRisk RegisterRisk AssessmentInherent RiskResidual RiskRisk MitigationAI GovernanceCompliance ManagementMicrosoft Excel

ISO/IEC 27001 Compliance Requirements Matrix for ALYSA

Compliance & Risk Management Analyst2026ALYSA AI Audit EcosystemBandung, West Java

Developed an ISO/IEC 27001 Compliance Requirements Matrix for the ALYSA platform to support information security governance, control mapping, and compliance monitoring. Mapped ISO/IEC 27001 requirements into structured compliance items, including security controls, implementation evidence, responsible parties, and monitoring mechanisms. Designed a compliance tracking framework to improve audit readiness, policy alignment, and security control visibility. Connected ISO 27001 compliance requirements with AI system governance to support secure and accountable AI-powered audit operations. Strengthened ALYSA's Governance, Risk & Compliance maturity by aligning information security requirements with operational and technical implementation.

ISO/IEC 27001Information Security ComplianceGovernance, Risk & ComplianceCompliance MatrixSecurity Control MappingAudit ReadinessAI GovernanceCompliance MonitoringMicrosoft Excel

Green Sustainability Platform

Full-Stack Web DeveloperFeb 2025 โ€“ Mar 2026PT. Telkom IndonesiaBandung, West Java

Developed a centralized sustainability reporting platform using REST API architecture. Built monitoring dashboards for structured green initiative reporting. Reduced manual reporting effort by approximately 40%.

JavaScriptREST APIWeb DashboardAuthenticationGit

EcoWaste & Bank Sampah Dashboard

Full-Stack Web DeveloperFeb 2025 โ€“ Mar 2026Telkom SDGsBandung, West Java

Developed a multi-village sustainability dashboard using JavaScript-based frontend and RESTful backend services. Enabled real-time waste monitoring across multiple locations. Integrated role-based authentication for three stakeholder levels: admin, operator, and supervisor. Implemented API-driven tracking modules handling more than 1,000 monitoring records.

JavaScriptREST APIWeb DashboardRole-Based AuthenticationGit

Digital Certification Platform

Full-Stack Web DeveloperFeb 2025 โ€“ Oct 2025Telkom SDGsBandung, West Java

Developed a digital certification management platform using frontend and RESTful backend services. Built secure authentication and structured certificate data management features. Improved governance and certification administration workflows through digitalization.

JavaScriptREST APIAuthentication SystemGit

Lecturer & SDGs Contribution System

Full-Stack Web DeveloperFeb 2025 โ€“ Oct 2025Telkom SDGsBandung, West Java

Engineered an academic contribution management system using CRUD-based REST services. Designed filtering and pagination systems capable of handling more than 1,000 lecturer contribution records efficiently. Reduced manual SDGs reporting workload by approximately 50%.

JavaScriptREST APICRUD SystemPaginationGit

CellPlan Tower Management System

Full-Stack Web DeveloperOct 2024 โ€“ Dec 2024DISKOMINFO Bandung CityBandung, West Java

Developed a web-based tower management system integrating location-based GIS services. Built dashboard visualization modules supporting telecommunications planning decisions. Optimized location data retrieval and improved data loading efficiency by approximately 30%.

JavaScriptREST APIGIS IntegrationWeb DashboardGit

โ—ˆ Recognition

Honors & Awards

1st Place โ€” HackIDEA IRA Competition

1st Place โ€” HackIDEA IRA Competition

Telkom Test House

February 2026

Awarded 1st place among 15 innovations in the HackIDEA competition organized by Telkom Test House.

2nd Place โ€” HackIDEA IRA Competition

2nd Place โ€” HackIDEA IRA Competition

Telkom Test House

February 2026

Awarded 2nd place among 15 innovations in the HackIDEA competition organized by Telkom Test House.

Top 50 Finalist โ€” DigiHack 2025 Competition

Top 50 Finalist โ€” DigiHack 2025 Competition

Digistar Club

October 2025

Recognized as a Top 50 finalist in a national hackathon organized by Digistar Club, demonstrating strong innovation, technical execution, and problem-solving capabilities.

Top 163 โ€” Innovillage 2023

Top 163 โ€” Innovillage 2023

PT Telkom Indonesia & Telkom University

December 2023

Contributed to a sociopreneurship innovation project among 795 competing teams.

3rd Place โ€” KOMFESIF UI/UX Competition 2023

3rd Place โ€” KOMFESIF UI/UX Competition 2023

KOMFESIF

December 2023

Won 3rd place in a UI/UX innovation competition with a four-member design team.

3rd Place โ€” UI/UX Competition Dies Natalis SI ITASE 5.0 2023

3rd Place โ€” UI/UX Competition Dies Natalis SI ITASE 5.0 2023

SI ITASE 5.0

November 2023

Won 3rd place in a UI/UX competition through collaborative design, prototyping, and problem-solving.

1st Runner Up โ€” JBC UI/UX Competition 2023

1st Runner Up โ€” JBC UI/UX Competition 2023

JBC Competition

October 2023

Recognized as 1st Runner Up for a UI/UX innovation project developed with a three-member team.

2nd Place โ€” Smart City Hackathon CYVERO 2023

2nd Place โ€” Smart City Hackathon CYVERO 2023

CYVERO

September 2023

Won 2nd place for developing an innovation aligned with smart city program needs.

๐Ÿ“„ Research Publications

A Methodological Comparison of Test Configurations for Quantifying Cabling-Induced PMD in FTTH Networks
ICRAMET 2025November 2025PublishedOral PresentationLead Author

A Methodological Comparison of Test Configurations for Quantifying Cabling-Induced PMD in FTTH Networks

Oral presentation at ICRAMET 2025 as Lead Author for a methodological comparison of FTTH test configurations used to quantify cabling-induced Polarization Mode Dispersion.

Data-Driven Telecommunication Infrastructure: AI Clustering and Geodesic Measurement for Strategic Tower Optimization
ICICyTA 2024December 2024PublishedOral PresentationLead Author

Data-Driven Telecommunication Infrastructure: AI Clustering and Geodesic Measurement for Strategic Tower Optimization

Oral presentation at ICICyTA 2024 as Lead Author, covering AI clustering and geodesic measurement methods for strategic telecommunications tower optimization.

โ—ˆ Get in touch

Let's Connect

I'm open to AI engineering, full-stack development, telecommunications, technology consulting, risk management, and GRC-oriented compliance technology opportunities.

Send a Message

Share a role, collaboration, research opportunity, or consulting brief.

This opens your email client with a prefilled message.

Bandung, West Java, Indonesia